As per officials, 50 metres of drilling has completed to take out the trapped labourers from the Silkyara Tunnel....
While the rescue operation faced setbacks, the trapped workers were provided with essentials - light, oxygen, food, water, and medicines. ...
The vertical drilling process is being done to lay an 800/900 mm or 1.3 m diameter pipeline to aid the rescue. ...
Workers said to be in good condition and are receiving sustenance, medicine, and emotional support through a small borehole pipe maintaining contact with the group....
Uttarkashi Tunnel Collapse: Arya, who holds the position of Leader of the Opposition in the Uttarakhand Assembly, accused the government of corruption in awarding contracts and raised concerns about the absence of an escape tunnel, a crucial safety measure that was overlooked....
Copyright © 2026 Top Indian News